Home
Up

H2 Modification of beam elements in shutdown 2003/04

OLD   NEW
type ID name modification type ID name
Quadrupole            
QWL 021.476 Q15 displaced 6m upstream   021.470  
QNL 021.486 Q16 displaced 6m upstream   021.479  
QNL 021.497 Q17 displaced 8m upstream   021.489  
new installation QPL 021.498 Q18
      new installation QPS 021.501 Q19
      new installation QPS 021.529 Q20
      new installation QPS 021.531 Q21
      new installation QPS 021.564 Q22
      new installation QPS 021.566 Q23
Dipoles            
MBPL 021.504   displaced MBPL 021.503 B7
      new installation MBPL 021.512 B7
      new installation MBPL 021.516 B8
      new installation MBPL 021.525 B8
MDXV 021.586   displaced     TRIM 5
MDXV 021.586   displaced     TRIM 6
Chambers            

XWCA

 

021.461

 

MWPC5,6

 

install swap configuration

 

 

(021.461)

021.492

(MWPC5,6)

MWPC5,6

      new install., 512 mm off XDWC 021.520 Spec1
      new installation XDWC 021.527 Spec3
      new installation XDWC 021.528 Spec4
Trigger            
XSCI 021.473 TRIG4 displace   021.466  
new installation XSCI 021.492 TRIG5
      new install., 512 mm off XSCI 021.521 TRIG6
      new installation XSCI 021.528 TRIG7
FISC            
XFFV 021.474 FISC9 displace   021.467  
XFFH 021.475 FISC10 displace   021.468  
XFSV526     de-installation      
XFSH527     de-installation      
Cherenkov            
      new installation XCET 021.520 VLE  beam
      new installation XCET 021.523 HE beam
Others            
      new installation XCON 021.493 T22
veto calorim. NA49   de-installation