Home
Up
Cherenkov counter

More information on Cherenkov counters

H8 instrumentation 2003 19.May 2003, Adrian Fabich    
FM-FFDD acceptance  
Scintillator counters      
# TYPE ID comment coinc  
1 XSCI 042.198 at 180 degree phase advance (+XWCA042198)    
2 XSCI 042.403 upstream of C8/9 +XWCA3/4, (diam 8cm)    
3 XSCI 042.410 (diam 10 cm)    
4 XSCI 042.420 (2x2 cm), for XEMC    
5 XSCI 042.463      
6 XSCI 042.475    
7 XSCI 042.509 upstream of T48    
8 XSCI 042.536      
9 XSCI 042.543      
10 XSCI 042.574 downstream of dump H8A/H8B    
Multi-wire proportional chamber  
# TYPE ID comment  
1,2 XWCA 042.198    
3,4 XWCA 042.403 upstream of C8/C9  
5,6 XWCA 042.509 upstream of T48  
SPEC1 XDWC 042.536 Spect_1 of VeryLowEnergy beam (horiz.displac by 512mm)  
SPEC3 XDWC 042.542 Spect_3, for both beam lines  
SPEC4 XDWC 042.543 Spect_4, for both beam lines  
ATLAS XDWC 042.555    
7,8 XWCA 042.574 downstream of dump H8A/H8B  
Fillament Counters (FISC)  
# TYPE ID comment  
1 XFFV 042.196    
2 XFFH 042.197    
4 XFFH 042.217    
5 XFFV 042.270    
6 XFFH 042.271    
7 XFFV 042.338    
8 XFFH 042.339    
9 XFFV 042.418    
10 XFFH 042.419    
11 XFFV 042.476    
12 XFFH 042.477    
13 XFSV 042.493    
14 XFSH 042.494